RECALIBRATION AND TESTING

RECALIBRATION AND TESTING

Refering to the AKTA BEKALAN ELEKTRIK 1990( AKTA 447), (SYARIKAT PENGGANTI 1990 AKTA 448) all the relays like earth fault /overcurrent/ ACB & main switchboard have to carry out service by competent person once every TWO (2) years, with the chop & sign report with registered Professional Engineer (PE). Suruhanjaya Tenaga got the right to fine in compound & temporary block the power supply if necessary.

AKTA BEKALAN ELEKTRIK 1990( AKTA 447)

SYARIKAT PENGGANTI 1990 AKTA 448